Visited Dragway today to confirm measurements before they welded the centers into the rims.
Took some more pics, measured the front space on Front and Rear Assemblies, centres hole and bolt PCD and the Caliper clearance from the hub mount face to the centre webs.
All good to go.
Front Wheel assembled and ready to weld then trued up and hub faced square to the rim.
Inside view of the Front Wheel.
In this pic, you can see the tape protecting the edge of the center from paint overspray before welding to the Rim.
Rear Wheel assembly.
Centers painted and awaiting assembly.
Center Caps all machined and painted.
This is a spinner that has been machined from a billet into the section profile before having the spinner shape machined.
Underside of a spinner, still to be center drilled and tapped for assembly to a boss that clamps through the Center Cap.
Spinner sitting on a Center Cap.